Dualization of Road from Zurub R/A to Al Buraimi R/A


MINISTRY OF TRANSPORT AND COMMUNICATIONS

National Engineering Services Pakistan & Partners LLC


+ More infos

The Project will allow the Dualization of an existing single carriageway. A 17 kilometers dual carriageway and service road of a total length of 27 kilometers will be constructed.

 

Description of Work:

- Construction of a 90 meters long post-tensioned three-cell box girder flyover bridge.

- Construction of two 53 meters long post-tensioned four-cell box grider interchanges bridges.

- Construction of four pedestrian underpasses 4 m x 4 m x 45 m.

- Road works including road stretching to approximately 1,000 m.

- Construction of a road leading to the UAE's border check post.

- Water drainage, asphalt works, signing and marking.

- Public utility service and traffic diversion and protection.

×



Bookmark and Share

Facebook Plugin