The construction of Wadi Adai Interchange incorporates the establishment of a third level "trumpt" arrangement that will facilitate left-turns. The interchange will be located in an urban zone with very heavy traffic.
Description of work:
- Construction of steel grant structure to support bridge deck formwork without interruption of traffic.
- Construction of bridge No. 2: (343 meters and 226 meters long) post-tensioned concrete two-cell box girder bridge with pile foundations.
- Road works including water drainage, asphalting, road lighting, safety barriers, paving and curbing, road signing and marking.
- Signalized at-grade intersection.
- Public utility service diversion and protection.
The construction of Wadi Adai Interchange incorporates the establishment of a third level "trumpt" arrangement that will facilitate left-turns. The interchange will be located in an urban zone with very heavy traffic.
Description of work:
- Construction of steel grant structure to support bridge deck formwork without interruption of traffic.
- Construction of bridge No. 2: (343 meters and 226 meters long) post-tensioned concrete two-cell box girder bridge with pile foundations.
- Road works including water drainage, asphalting, road lighting, safety barriers, paving and curbing, road signing and marking.
- Signalized at-grade intersection.
- Public utility service diversion and protection.
×